Suspended Jetty Piles, Thevenard Off-Loading Facility.

Surepipe New South Wales supplied 508od x 15.90mm wall steel pipes, spliced to 18m long and coated for a suspended Jetty Pile project. Thevenard Off-Loading Facility in Ceduna South Australia.

Project: Suspended Jetty Piles, Thevenard Off-Loading Facility.

Ceduna South Australia.

Pipe: 508od x 15.90mm wall steel pipes, spliced to 18m long and coated.

Spliced in-house to AS1554.1 SP by Surepipe NSW.

Testimonials

Accent

When you want to be sure, ask Surepipe.

There’s a lot for you to consider when choosing a steel pipe or casing supplier. But if you want peace of mind, getting a quote from Surepipe is a must.

Get a quote now